/ INSTANT ESTIMATE · DEMO

Drawing in. Costed quote out.

Upload a DXF site drawing and we measure it on the spot — areas and lengths off the drawing, set out as an indicative Bill of Quantities. A Supreme estimator confirms every line before anything is issued. Your drawing is measured in your browser and is never uploaded.

Upload your drawing

Drop a .dxf here or click to choose a file

No drawing handy? Try a sample site plan · Big file or PDF? email it to us.

Most metric DXFs are 1 m per unit; millimetre drawings are 0.001. If unsure, click two points on the preview whose real distance you know.

No drawing loaded yet

Your measured Bill of Quantities will appear here.

Basis of measurement & assumptions. Quantities are measured directly from the drawing's vector geometry (areas and lengths), prepared on NRM2 principles and priced on indicative all-in rates — cross-checked against live supplier pricing at quote stage. Nothing is issued to a client until a Supreme estimator confirms it.
  • Site clearance is measured over the gross plot area (not net of the building/driveway footprints).
  • Assumes a reasonably level site, standard ground-bearing conditions, no rock or contamination, and normal access.
  • Excludes: ground investigation, abnormals/contaminated-ground disposal, statutory & utility connection fees, professional fees, party-wall, planning conditions, and VAT unless shown.
  • Curved features (arcs, circles, splines) and enumerated items (manholes, gullies) are flagged needs QS for manual measure.